Projects
We want to present a choice of reference projects
Structural calculation assembly group "Working platform"
The working platform of the bridge inspection unit carries up to 8 persons. The platform can be moved hydraulically under the bridge deck.
Thus, the areas underneath the bridge can be reached easisly to perform inspection and redevelopment works.
Task:
- Development of a calculation model consisting of beam an shell elements
- Definition of load an bearing conditions confirming actual standards
- Stress analysis
- Stability analysis
- Proof of welded connections
- Proof of hydraulic cylinders
- Preparation of a verifiable documentation

Development propulsion system Transport unit "Asinus 350"
The lifting unit allows the transportation and lifting of stone working plates with a weight of up to 350 kg.
The unit was introduced on the "Stone Tec" exhibition in Las Vegas and is now in use on all continents successfully.
A new version with a raised payload of 50 kg is now delivered to the first customers.
Tasks:
- Choice and calculation of the battery driven propulsion system of Asinus 350
- Structural proof of the frame and load handling attachement confirming to actual standards.
- Preparation of the complete documentation consisting of operation and maintenance manual, spare parts list, risk assessment.
- Preparation of all documents for european type approval
Structural calculation assembly group "Lifting frame"
The frame acts as suporting structure for a Bridge Inspection Unit.
It lifts the whole unit hydraulically to overbridge high noise barrieres and other obstacles.
Tasks:
- Development of a calculation model
- Definition of contact conditions
- Definition of load an bearing conditions confirming actual standards
- Stress analysis
- Stability analysis
- Proof of welded connections
- Proof of hydraulic cylinders
- Preparation of a verifiable documentation
Structural calculation"Crane kinematics"
The kinematic is the cutting site between the crane boom and the used accessory equipment. The flexible use of many equipemts is possible.
Tasks:
- Development of a calculation model based on the customers geometry data
- Definition of load an bearing conditions confirming actual standards
- Stress analysis
- Proof of welded connections
- Proof of fatigue strength
- Proof of the pressure of hydraulic cylinder
- Preparation of a verifiable documentation